Professional Electrical Control Panel and Automation System

Advanced Electrical & Automation Systems

Empowering industry with precision electrical engineering, robust automation, and next-generation computer vision solutions.

Electrical & Automation Experts

Integrated Industrial Engineering

We bridge the gap between electrical infrastructure and digital intelligence. From wiring complex control panels to deploying smart cameras for quality assurance, IMC Core is your partner in industrial modernization.

  • Electrical Control Panel Design
  • PLC & SCADA Automation
  • Computer Vision Quality Control
Explore Services
Electrical Control Panels and Automation Wiring

Technical Expertise

Delivering comprehensive solutions for electrical, automation, and visual inspection challenges.

Electrical Systems

Electrical Systems

High-standard electrical panel fabrication, wiring, and power distribution infrastructure.

Automation & SCADA

Automation & SCADA

Centralized control and monitoring of industrial processes with real-time data visualization.

Computer Vision

Computer Vision

Automated visual inspection systems using advanced image processing algorithms.

System Safety

System Safety

Safety-critical electrical design and fail-safe automation logic for personnel protection.

Systems & Projects Gallery

Electrical Control Panels

Electrical Panels

SCADA Monitoring System

SCADA Systems

Industrial Automation & Robotics

Automation

Professional Electrical Wiring

Wiring & Cabling

Computer Vision Inspection

Computer Vision

Power Distribution Panels

Power Distribution

Ready to modernize your production line?

Contact us for electrical, automation, and vision system upgrades.

Start Project

Frequently Asked Questions

How much does an industrial automation project cost in Jordan?+

Costs vary by project size and complexity. Single production line automation starts from $10,000–$50,000, while full factory automation ranges from $200,000–$500,000. We offer free consultations and detailed needs assessments.

What is the difference between PLC, SCADA, and HMI?+

PLC is the small computer that physically controls equipment. SCADA is the software system that collects data from PLCs and displays it to operators. HMI is the screen operators interact with. PLC = Brain, SCADA = Eyes, HMI = Hand.

Do you provide maintenance after delivery?+

Yes. We offer comprehensive maintenance packages including periodic inspections, component replacement, and circuit upgrades. We also provide 24/7 emergency support for critical industrial operations.

How long does a control panel project take?+

Duration depends on panel complexity. A typical control panel takes 3–6 weeks from design to delivery. We provide detailed schematics for approval before fabrication begins.

Do you work outside Amman?+

Yes. While based in Amman, we serve clients across Jordan and the region. Site visits and installations are available nationwide.

What accuracy can computer vision systems achieve?+

Modern systems achieve up to 99.9% defect detection accuracy. We conduct pilot testing on your actual product samples to verify performance before final installation.